Grid Interconnection Assessment
Review the preparation requirements before entering the detailed application wizard.
Prepare your supporting information
This service requires a structured technical review. Please read the document checklist below before entering the application wizard. All institutional identity, representative identity and evidence-readiness declarations are mandatory. Actual document upload will require the upcoming secure storage integration.
Recommended supporting documents
- Electrical single-line diagrams
- Metering and demand records
- Protection studies
- Existing equipment schedules
- Site drawings or technical documents (if available)
- Supporting documents (if applicable)
Important instructions
- Provide accurate organization, contact and project information.
- Use verified technical figures and units where available.
- Do not email identity documents or confidential project files. Private document uploads are available after verified case submission when MHC FEL is configured.
- A request is not a certification, regulatory filing or acceptance of work.
- You can return to the service overview at any time.
Requesting entity — registration
Provide the complete registered identity of the institution.
Registered address & requesting department
Specify the complete official address and responsible office.
Authorized representative
Identify the individual officially acting on behalf of the institution.
Site and operating context
Identify the location and explain the site or operating environment.
Technical profile — I
Provide the first set of service-specific engineering requirements.
Technical profile — II
Continue with equipment, capacity and operating considerations.
Technical profile — III
Complete the remaining technical specifications and constraints.
Scope and delivery priorities
Explain your intended outcomes, timing and any other information relevant to the assessment.
Mandatory supporting evidence
Confirm each mandatory supporting record is ready for later secure verification. File uploads are not active.
Declarations and review
Review the requirements and understand the conditions of formal submission.
Email verification and submission
Verify your email using a one-time code before submitting your application.
Email-only intake beta: no online tracking or file uploads. Never enter passwords, bank details or confidential documents.